Freezpak Logistics

Financing Amount: $30,083,709

Property Summary:

On November 30, 2022, the Philadelphia Energy Authority, Nuveen Green Capital and BGFP Philadelphia LLC closed on C-PACE financing for energy efficiency and water conservation  measures to be installed during the construction of a new cold storage facility located at 2201 E. Allegheny Avenue. 

The planned facility is located in the Port Richmond neighborhood of Philadelphia. It will be a 168K SF facility. The facility as designed is expected to be 30% more energy efficient than required by Philadelphia’s building energy code.

The energy survey was prepared by Pennoni.

DOWNLOAD